The Pacific Solar phase II project is designed to generate 28.4 MW nominal, reaching 35.55 MWp. Constituted by 5 Investment Centers of 4.8 MWAs plus one of 2.4 MVAs and a total of 104,700 photovoltaic modules of power 330 Wp and 1500 V. The support structure of the panels will be a monofilayer tracker with tracking to an axis and the evacuation of the generated energy will be through a Medium Voltage line of 34.5 kV. The park will have a state-of-the-art CCTV system and general monitoring.
Social benefits:
Generation of more than 300 jobs.
Subcontracting of 30 local companies.
Reduction of CO2 at a rate of 35,000 tons per year
Commitment to Kyoto Protocol.